Installation done

Mi3 has carried out the installation of air conditioning by means of a biomass boiler with a pellet storage silo of a 12,5m3 capacity fed through a screw and the installation of a water-water geothermal chiller with a nominal power of 80kW, Air renovation works have also been carried out with heat recovery and centralized control of the installation, all in the Center of Agri-food and Innovation of the town of Huetor Tajar (Granada).